Solar plant: site data

Solar power plant in Novi Mlyny, Koriukivskyi Raion, Chernihiv Oblast

Novi Mlyny: 1,090 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.6% below the oblast median (1,108). #100 of 220 in the rayon, #1189 of 1558 in the oblast.

Koryukivka, the rayon centre, is 29 km away. 113 m above sea level. 29 km away: Koryukivka, the nearest bigger centre, 1,085 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 48 km. 14.30 m between rows, pitch 18.07 m (latitude 51.8°).

Yield of 1 kWp
1,090kWh/year
Tilt
38°3° east of south
10 kW
10,904kWh/year
Row pitch
18.07m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Novi Mlyny

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 48 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan57Feb97Mar116Apr138May142Jun138Jul135Aug108Sep72Oct30Nov24Dec

June: 142 kWh/kWp, December: 24 — 5.9 times less.

November: 30 against 33 in the oblast, 9.1% less.

Novi Mlyny: plants, kWh
kWpA yearJuneDecember
55,452710120
1010,9041,420240
1516,3562,130360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Koriukivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.