Solar plant: site data

Solar power plant in Naikyne, Novhorod-Siverskyi Raion, Chernihiv Oblast

Naikyne: 1,082 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 2.3% below the oblast median (1,108). #190 of 247 in the rayon, #1382 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 24 km away. 170 m above sea level. 24 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 139 km. 15.14 m between rows, pitch 18.86 m (latitude 52.2°).

Yield of 1 kWp
1,082kWh/year
Tilt
39°3° east of south
10 kW
10,824kWh/year
Row pitch
18.86m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Naikyne

The designer opens with this place’s coordinates, latitude 52.2° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 139 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan60Feb99Mar113Apr137May139Jun136Jul132Aug105Sep69Oct31Nov25Dec

June: 139 kWh/kWp, December: 25 — 5.6 times less.

January: 38 against 35 in the oblast, 8.6% more.

Naikyne: plants, kWh
kWpA yearJuneDecember
55,412695125
1010,8241,390250
1516,2362,085375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.