Solar plant: site data
Solar power plant in Mykhailo-Kotsiubynske, Chernihivskyi Raion, Chernihiv Oblast
Mykhailo-Kotsiubynske: 1,111 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,108). #165 of 479 in the rayon, #628 of 1558 in the oblast.
Chernihiv, the rayon centre, is 16 km away. 134 m above sea level. 16 km away: Chernihiv, the nearest bigger centre, 1,105 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 15 km. 13.92 m between rows, pitch 17.69 m (latitude 51.5°).
- Yield of 1 kWp
- 1,111kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,113kWh/year
- Row pitch
- 17.69m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Mykhailo-Kotsiubynske
The designer opens with this place’s coordinates, latitude 51.5° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 15 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 142 kWh/kWp, December: 25 — 5.7 times less.
March: 100 against 96 in the oblast, 4.2% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,557 | 710 | 125 |
| 10 | 11,113 | 1,420 | 250 |
| 15 | 16,670 | 2,130 | 375 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Zaitsi4 km1,109 kWh/kWp
- Levkovychi5 km1,112 kWh/kWp
- Mazhuhivka6 km1,115 kWh/kWp
- Lhiv7 km1,109 kWh/kWp
- Andriivka7 km1,114 kWh/kWp
- Lhivka8 km1,107 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.