Solar plant: site data
Solar power plant in Morhulychi, Chernihivskyi Raion, Chernihiv Oblast
Morhulychi: 1,107 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,108). #220 of 479 in the rayon, #817 of 1558 in the oblast.
Chernihiv, the rayon centre, is 27 km away. 122 m above sea level. 27 km away: Chernihiv, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Чернігів, 27 km. 14.06 m between rows, pitch 17.83 m (latitude 51.6°).
- Yield of 1 kWp
- 1,107kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,070kWh/year
- Row pitch
- 17.83m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Morhulychi
The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 27 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 144 kWh/kWp, December: 23 — 6.3 times less.
January: 32 against 35 in the oblast, 8.6% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,535 | 720 | 115 |
| 10 | 11,070 | 1,440 | 230 |
| 15 | 16,605 | 2,160 | 345 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Petrove2 km1,108 kWh/kWp
- Horytsia5 km1,109 kWh/kWp
- Boromyky6 km1,109 kWh/kWp
- Loknyste6 km1,109 kWh/kWp
- Bihach6 km1,103 kWh/kWp
- Klochkiv6 km1,100 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.