Solar plant: site data

Solar power plant in Mars, Novhorod-Siverskyi Raion, Chernihiv Oblast

Mars: 1,065 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 3.8% below the oblast median (1,108). #237 of 247 in the rayon, #1530 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 40 km away. 156 m above sea level. 40 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 123 km. 15.14 m between rows, pitch 18.86 m (latitude 52.2°).

Yield of 1 kWp
1,065kWh/year
Tilt
39°3° east of south
10 kW
10,654kWh/year
Row pitch
18.86m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Mars

The designer opens with this place’s coordinates, latitude 52.2° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 123 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb96Mar113Apr136May138Jun135Jul132Aug104Sep69Oct30Nov22Dec

June: 138 kWh/kWp, December: 22 — 6.3 times less.

November: 30 against 33 in the oblast, 9.1% less.

Mars: plants, kWh
kWpA yearJuneDecember
55,327690110
1010,6541,380220
1515,9812,070330

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.