Solar plant: site data

Solar power plant in Malkivka, Prylutskyi Raion, Chernihiv Oblast

Malkivka: 1,119 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.0% above the oblast median (1,108). #171 of 285 in the rayon, #331 of 1558 in the oblast.

Pryluky, the rayon centre, is 8 km away. 123 m above sea level. 8 km away: Pryluky, the nearest bigger centre, the same 1,116. Snow and wind from the nearest regional centre in the DBN — Черкаси, 123 km. 12.60 m between rows, pitch 16.42 m (latitude 50.5°).

Yield of 1 kWp
1,119kWh/year
Tilt
37°2° east of south
10 kW
11,189kWh/year
Row pitch
16.42m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Malkivka

The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 123 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan57Feb94Mar117Apr139May143Jun144Jul142Aug112Sep79Oct35Nov24Dec

July: 144 kWh/kWp, December: 24 — 6.0 times less.

November: 35 against 33 in the oblast, 6.1% more.

Malkivka: plants, kWh
kWpA yearJulyDecember
55,595720120
1011,1891,440240
1516,7842,160360

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.