Solar plant: site data

Solar power plant in Loska, Novhorod-Siverskyi Raion, Chernihiv Oblast

Loska: 1,079 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 2.6% below the oblast median (1,108). #210 of 247 in the rayon, #1432 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 31 km away. 163 m above sea level. 31 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 117 km. 14.73 m between rows, pitch 18.45 m (latitude 51.8°).

Yield of 1 kWp
1,079kWh/year
Tilt
39°3° east of south
10 kW
10,792kWh/year
Row pitch
18.45m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Loska

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 117 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan55Feb96Mar113Apr137May139Jun136Jul134Aug106Sep71Oct31Nov24Dec

June: 139 kWh/kWp, December: 24 — 5.8 times less.

November: 31 against 33 in the oblast, 6.1% less.

Loska: plants, kWh
kWpA yearJuneDecember
55,396695120
1010,7921,390240
1516,1882,085360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.