Solar plant: site data

Solar power plant in Kysli, Chernihivskyi Raion, Chernihiv Oblast

Kysli: 1,092 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.5% below the oblast median (1,108). #366 of 479 in the rayon, #1154 of 1558 in the oblast.

Chernihiv, the rayon centre, is 40 km away. 149 m above sea level. 40 km away: Chernihiv, the nearest bigger centre, 1,105 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 41 km. 14.30 m between rows, pitch 18.07 m (latitude 51.8°).

Yield of 1 kWp
1,092kWh/year
Tilt
38°2° east of south
10 kW
10,917kWh/year
Row pitch
18.07m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kysli

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 41 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan56Feb97Mar118Apr137May142Jun139Jul134Aug108Sep74Oct31Nov22Dec

June: 142 kWh/kWp, December: 22 — 6.5 times less.

January: 32 against 35 in the oblast, 8.6% less.

Kysli: plants, kWh
kWpA yearJuneDecember
55,459710110
1010,9171,420220
1516,3762,130330

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.