Solar plant: site data
Solar power plant in Kuvechychi, Chernihivskyi Raion, Chernihiv Oblast
Kuvechychi: 1,110 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #186 of 479 in the rayon, #696 of 1558 in the oblast.
Chernihiv, the rayon centre, is 27 km away. 142 m above sea level. 27 km away: Chernihiv, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Чернігів, 28 km. 14.13 m between rows, pitch 17.90 m (latitude 51.6°).
- Yield of 1 kWp
- 1,110kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 11,096kWh/year
- Row pitch
- 17.90m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Kuvechychi
The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 28 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 143 kWh/kWp, December: 23 — 6.2 times less.
November: 31 against 33 in the oblast, 6.1% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,548 | 715 | 115 |
| 10 | 11,096 | 1,430 | 230 |
| 15 | 16,644 | 2,145 | 345 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Pavlivka4 km1,112 kWh/kWp
- Dovzhyk5 km1,107 kWh/kWp
- Moskali5 km1,112 kWh/kWp
- Tamarivka5 km1,113 kWh/kWp
- Antonovychi6 km1,110 kWh/kWp
- Dukhanky6 km1,112 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.