Solar plant: site data

Solar power plant in Kuty Druhi, Novhorod-Siverskyi Raion, Chernihiv Oblast

Kuty Druhi: 1,076 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 2.9% below the oblast median (1,108). #223 of 247 in the rayon, #1479 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 49 km away. 133 m above sea level. 44 km away: Koryukivka, the nearest bigger centre, 1,085 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 111 km. 15.08 m between rows, pitch 18.80 m (latitude 52.1°).

Yield of 1 kWp
1,076kWh/year
Tilt
39°3° east of south
10 kW
10,761kWh/year
Row pitch
18.80m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kuty Druhi

The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 111 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb95Mar114Apr136May138Jun136Jul134Aug106Sep70Oct30Nov23Dec

June: 138 kWh/kWp, December: 23 — 6.0 times less.

November: 30 against 33 in the oblast, 9.1% less.

Kuty Druhi: plants, kWh
kWpA yearJuneDecember
55,381690115
1010,7611,380230
1516,1412,070345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.