Solar plant: site data

Solar power plant in Kusii, Chernihivskyi Raion, Chernihiv Oblast

Kusii: 1,086 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 2.0% below the oblast median (1,108). #398 of 479 in the rayon, #1276 of 1558 in the oblast.

Chernihiv, the rayon centre, is 69 km away. 150 m above sea level. 69 km away: Koryukivka, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Чернігів, 70 km. 15.09 m between rows, pitch 18.81 m (latitude 52.1°).

Yield of 1 kWp
1,086kWh/year
Tilt
39°2° east of south
10 kW
10,861kWh/year
Row pitch
18.81m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kusii

The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 70 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan61Feb97Mar116Apr137May140Jun138Jul134Aug107Sep71Oct29Nov22Dec

June: 140 kWh/kWp, December: 22 — 6.4 times less.

November: 29 against 33 in the oblast, 12.1% less.

Kusii: plants, kWh
kWpA yearJuneDecember
55,431700110
1010,8611,400220
1516,2912,100330

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.