Solar plant: site data

Solar power plant in Kukari, Chernihivskyi Raion, Chernihiv Oblast

Kukari: 1,079 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 2.6% below the oblast median (1,108). #425 of 479 in the rayon, #1432 of 1558 in the oblast.

Chernihiv, the rayon centre, is 51 km away. 110 m above sea level. 51 km away: Chernihiv, the nearest bigger centre, 1,105 — 2.4% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 52 km. 14.21 m between rows, pitch 17.98 m (latitude 51.7°).

Yield of 1 kWp
1,079kWh/year
Tilt
38°2° east of south
10 kW
10,792kWh/year
Row pitch
17.98m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kukari

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 52 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan56Feb95Mar116Apr135May139Jun136Jul132Aug108Sep74Oct31Nov24Dec

June: 139 kWh/kWp, December: 24 — 5.8 times less.

November: 31 against 33 in the oblast, 6.1% less.

Kukari: plants, kWh
kWpA yearJuneDecember
55,396695120
1010,7921,390240
1516,1882,085360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.