Solar plant: site data

Solar power plant in Krynychky, Novhorod-Siverskyi Raion, Chernihiv Oblast

Krynychky: 1,085 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 2.1% below the oblast median (1,108). #151 of 247 in the rayon, #1307 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 60 km away. 143 m above sea level. 55 km away: Koryukivka, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Чернігів, 117 km. 15.27 m between rows, pitch 18.99 m (latitude 52.3°).

Yield of 1 kWp
1,085kWh/year
Tilt
39°3° east of south
10 kW
10,846kWh/year
Row pitch
18.99m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Krynychky

The designer opens with this place’s coordinates, latitude 52.3° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 117 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan61Feb99Mar113Apr137May138Jun135Jul133Aug105Sep70Oct29Nov26Dec

June: 138 kWh/kWp, December: 26 — 5.3 times less.

November: 29 against 33 in the oblast, 12.1% less.

Krynychky: plants, kWh
kWpA yearJuneDecember
55,423690130
1010,8461,380260
1516,2692,070390

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.