Solar power plant in Kozatske, Nizhynskyi Raion, Chernihiv Oblast

Kozatske: 1,119 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.0% above the oblast median (1,108). #78 of 327 in the rayon, #339 of 1558 in the oblast.

Nizhyn, the rayon centre, is 49 km away. 127 m above sea level. 49 km away: Nizhyn, the nearest bigger centre, 1,108 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 82 km. 12.71 m between rows, pitch 16.53 m (latitude 50.6°).

Yield of 1 kWp
1,119kWh/year
Tilt
37°2° east of south
10 kW
11,188kWh/year
Row pitch
16.53m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Kozatske

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Київ, 82 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan53Feb90Mar118Apr139May145Jun146Jul141Aug112Sep80Oct35Nov25Dec

July: 146 kWh/kWp, December: 25 — 5.8 times less.

February: 53 against 57 in the oblast, 7.0% less.

Kozatske: plants, kWh
kWpA yearJulyDecember
55,594730125
1011,1881,460250
1516,7822,190375

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.