Solar plant: site data

Solar power plant in Ivashkivka, Chernihivskyi Raion, Chernihiv Oblast

Ivashkivka: 1,106 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #231 of 479 in the rayon, #846 of 1558 in the oblast.

Chernihiv, the rayon centre, is 24 km away. 128 m above sea level. 24 km away: Chernihiv, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Чернігів, 26 km. 14.22 m between rows, pitch 17.99 m (latitude 51.7°).

Yield of 1 kWp
1,106kWh/year
Tilt
38°1° east of south
10 kW
11,064kWh/year
Row pitch
17.99m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Ivashkivka

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 26 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan59Feb100Mar119Apr139May144Jun141Jul137Aug109Sep74Oct30Nov24Dec

June: 144 kWh/kWp, December: 24 — 6.0 times less.

January: 31 against 35 in the oblast, 11.4% less.

Ivashkivka: plants, kWh
kWpA yearJuneDecember
55,532720120
1011,0641,440240
1516,5962,160360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.