Solar plant: site data

Solar power plant in Ivanivka, Chernihivskyi Raion, Chernihiv Oblast

Ivanivka: 1,120 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.1% above the oblast median (1,108). #81 of 479 in the rayon, #264 of 1558 in the oblast.

Chernihiv, the rayon centre, is 14 km away. 107 m above sea level. 14 km away: Chernihiv, the nearest bigger centre, 1,105 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 13 km. 13.83 m between rows, pitch 17.60 m (latitude 51.4°).

Yield of 1 kWp
1,120kWh/year
Tilt
38°1° east of south
10 kW
11,202kWh/year
Row pitch
17.60m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Ivanivka

The designer opens with this place’s coordinates, latitude 51.4° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 13 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan58Feb100Mar120Apr140May143Jun142Jul137Aug112Sep77Oct32Nov24Dec

June: 143 kWh/kWp, December: 24 — 6.0 times less.

March: 100 against 96 in the oblast, 4.2% more.

Ivanivka: plants, kWh
kWpA yearJuneDecember
55,601715120
1011,2021,430240
1516,8032,145360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.