Solar plant: site data

Solar power plant in Hutyshche, Koriukivskyi Raion, Chernihiv Oblast

Hutyshche: 1,087 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.9% below the oblast median (1,108). #123 of 220 in the rayon, #1258 of 1558 in the oblast.

Koryukivka, the rayon centre, is 25 km away. 143 m above sea level. 25 km away: Koryukivka, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Чернігів, 95 km. 14.27 m between rows, pitch 18.04 m (latitude 51.7°).

Yield of 1 kWp
1,087kWh/year
Tilt
38°2° east of south
10 kW
10,871kWh/year
Row pitch
18.04m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Hutyshche

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 95 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb96Mar115Apr138May140Jun138Jul136Aug107Sep72Oct31Nov23Dec

June: 140 kWh/kWp, December: 23 — 6.1 times less.

November: 31 against 33 in the oblast, 6.1% less.

Hutyshche: plants, kWh
kWpA yearJuneDecember
55,436700115
1010,8711,400230
1516,3062,100345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Koriukivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.