Solar power plant in Holubivka, Chernihivskyi Raion, Chernihiv Oblast

Holubivka: 1,097 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 1.0% below the oblast median (1,108). #325 of 479 in the rayon, #1066 of 1558 in the oblast.

Chernihiv, the rayon centre, is 46 km away. 156 m above sea level. 46 km away: Chernihiv, the nearest bigger centre, 1,105 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 47 km. 14.26 m between rows, pitch 18.03 m (latitude 51.7°).

Yield of 1 kWp
1,097kWh/year
Tilt
38°1° west of south
10 kW
10,971kWh/year
Row pitch
18.03m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Holubivka

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 47 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan59Feb98Mar119Apr137May141Jun139Jul134Aug109Sep74Oct31Nov22Dec

June: 141 kWh/kWp, December: 22 — 6.4 times less.

December: 22 against 24 in the oblast, 8.3% less.

Holubivka: plants, kWh
kWpA yearJuneDecember
55,486705110
1010,9711,410220
1516,4572,115330

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources