Solar plant: site data

Solar power plant in Byryne, Novhorod-Siverskyi Raion, Chernihiv Oblast

Byryne: 1,092 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.5% below the oblast median (1,108). #83 of 247 in the rayon, #1154 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 12 km away. 135 m above sea level. 12 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 158 km. 15.04 m between rows, pitch 18.76 m (latitude 52.1°).

Yield of 1 kWp
1,092kWh/year
Tilt
39°2° east of south
10 kW
10,917kWh/year
Row pitch
18.76m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Byryne

The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 158 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan59Feb95Mar115Apr140May142Jun138Jul135Aug106Sep70Oct31Nov25Dec

June: 142 kWh/kWp, December: 25 — 5.7 times less.

October: 70 against 75 in the oblast, 6.7% less.

Byryne: plants, kWh
kWpA yearJuneDecember
55,459710125
1010,9171,420250
1516,3762,130375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.