Solar plant: site data

Solar power plant in Budyshche, Chernihivskyi Raion, Chernihiv Oblast

Budyshche: 1,129 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.9% above the oblast median (1,108). #39 of 479 in the rayon, #43 of 1558 in the oblast.

Chernihiv, the rayon centre, is 51 km away. 115 m above sea level. 44 km away: Nizhyn, the nearest bigger centre, 1,108 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 50 km. 13.44 m between rows, pitch 17.21 m (latitude 51.0°).

Yield of 1 kWp
1,129kWh/year
Tilt
38°2° east of south
10 kW
11,289kWh/year
Row pitch
17.21m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Budyshche

The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 50 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb98Mar119Apr140May145Jun144Jul139Aug113Sep78Oct34Nov26Dec

June: 145 kWh/kWp, December: 26 — 5.6 times less.

December: 26 against 24 in the oblast, 8.3% more.

Budyshche: plants, kWh
kWpA yearJuneDecember
55,645725130
1011,2891,450260
1516,9342,175390

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.