Solar plant: site data

Solar power plant in Borzna, Nizhynskyi Raion, Chernihiv Oblast

Borzna: 1,115 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.6% above the oblast median (1,108). #134 of 327 in the rayon, #496 of 1558 in the oblast.

Nizhyn, the rayon centre, is 44 km away. 133 m above sea level. 44 km away: Nizhyn, the nearest bigger centre, 1,108 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 83 km. 13.68 m between rows, pitch 17.45 m (latitude 51.3°).

Yield of 1 kWp
1,115kWh/year
Tilt
38°1° east of south
10 kW
11,146kWh/year
Row pitch
17.45m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Borzna

The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 83 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan58Feb95Mar117Apr140May143Jun143Jul139Aug110Sep76Oct33Nov24Dec

June: 143 kWh/kWp, December: 24 — 6.0 times less.

January: 34 against 35 in the oblast, 2.9% less.

Borzna: plants, kWh
kWpA yearJuneDecember
55,573715120
1011,1461,430240
1516,7192,145360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed