Solar plant: site data

Solar power plant in Borzentsiv, Novhorod-Siverskyi Raion, Chernihiv Oblast

Borzentsiv: 1,108 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #17 of 247 in the rayon, #771 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 53 km away. 126 m above sea level. 37 km away: Konotop, the nearest bigger centre, the same 1,110. Snow and wind from the nearest regional centre in the DBN — Чернігів, 122 km. 14.04 m between rows, pitch 17.81 m (latitude 51.5°).

Yield of 1 kWp
1,108kWh/year
Tilt
38°1° east of south
10 kW
11,082kWh/year
Row pitch
17.81m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Borzentsiv

The designer opens with this place’s coordinates, latitude 51.5° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 122 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan60Feb98Mar116Apr141May142Jun141Jul137Aug108Sep74Oct33Nov24Dec

June: 142 kWh/kWp, December: 24 — 5.9 times less.

February: 60 against 57 in the oblast, 5.3% more.

Borzentsiv: plants, kWh
kWpA yearJuneDecember
55,541710120
1011,0821,420240
1516,6232,130360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.