Solar plant: site data
Solar power plant in Berlozy, Chernihivskyi Raion, Chernihiv Oblast
Berlozy: 1,127 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.8% above the oblast median (1,108). #47 of 479 in the rayon, #60 of 1558 in the oblast.
Chernihiv, the rayon centre, is 68 km away. 110 m above sea level. 50 km away: Brovary, the nearest bigger centre, the same 1,126. Snow and wind from the nearest regional centre in the DBN — Чернігів, 66 km. 13.28 m between rows, pitch 17.05 m (latitude 50.9°).
- Yield of 1 kWp
- 1,127kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,273kWh/year
- Row pitch
- 17.05m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Berlozy
The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 66 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 145 kWh/kWp, December: 27 — 5.4 times less.
December: 27 against 24 in the oblast, 12.5% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,637 | 725 | 135 |
| 10 | 11,273 | 1,450 | 270 |
| 15 | 16,910 | 2,175 | 405 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Hlomazdy1 km1,131 kWh/kWp
- Chasnivtsi2 km1,131 kWh/kWp
- Syvukhy3 km1,126 kWh/kWp
- Zherebetske3 km1,131 kWh/kWp
- Kozelets3 km1,126 kWh/kWp
- Zakrevske3 km1,131 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.