Solar plant: site data

Solar power plant in Berezovytsia, Prylutskyi Raion, Chernihiv Oblast

Berezovytsia: 1,113 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,108). #258 of 285 in the rayon, #577 of 1558 in the oblast.

Pryluky, the rayon centre, is 56 km away. 144 m above sea level. 35 km away: Romny, the nearest bigger centre, 1,126 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 123 km. 12.96 m between rows, pitch 16.78 m (latitude 50.9°).

Yield of 1 kWp
1,113kWh/year
Tilt
37°2° east of south
10 kW
11,125kWh/year
Row pitch
16.78m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Berezovytsia

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Суми, 123 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan58Feb92Mar116Apr140May143Jun145Jul141Aug109Sep77Oct35Nov22Dec

July: 145 kWh/kWp, December: 22 — 6.6 times less.

December: 22 against 24 in the oblast, 8.3% less.

Berezovytsia: plants, kWh
kWpA yearJulyDecember
55,563725110
1011,1251,450220
1516,6882,175330

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.