Solar power plant in Aksakovka, Nizhynskyi Raion, Chernihiv Oblast
Aksakovka: 1,120 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.1% above the oblast median (1,108). #59 of 327 in the rayon, #278 of 1558 in the oblast.
Nizhyn, the rayon centre, is 35 km away. 110 m above sea level. 35 km away: Nizhyn, the nearest bigger centre, 1,108 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 49 km. 13.45 m between rows, pitch 17.22 m (latitude 51.1°).
- Yield of 1 kWp
- 1,120kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,198kWh/year
- Row pitch
- 17.22m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Aksakovka
The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 49 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 143 kWh/kWp, December: 26 — 5.5 times less.
December: 26 against 24 in the oblast, 8.3% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,599 | 715 | 130 |
| 10 | 11,198 | 1,430 | 260 |
| 15 | 16,797 | 2,145 | 390 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Kyselivka0 km1,120 kWh/kWp
- Rozdolne3 km1,122 kWh/kWp
- Derzhanivka3 km1,127 kWh/kWp
- Adamivka4 km1,122 kWh/kWp
- Vedmedivka5 km1,122 kWh/kWp
- Selyshche7 km1,124 kWh/kWp
All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.