Solar plant: site data
Solar power plant in Petrakivka, Zvenyhorodskyi Raion, Cherkasy Oblast
Petrakivka: 1,136 kWh per kWp a year, tilt 35° 2° east of south (PVGIS). 0.7% below the oblast median (1,144). #178 of 197 in the rayon, #587 of 731 in the oblast.
Shpola, the rayon centre, is 35 km away. 163 m above sea level. 18 km away: Katerynopil, the nearest bigger centre, the same 1,140. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 94 km. 10.53 m between rows, pitch 14.45 m (latitude 48.8°).
- Yield of 1 kWp
- 1,136kWh/year
- Tilt
- 35°2° east of south
- 10 kW
- 11,360kWh/year
- Row pitch
- 14.45m · GCR 0.33
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Petrakivka
The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 94 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 149 kWh/kWp, December: 26 — 5.7 times less.
January: 31 against 35 in the oblast, 11.4% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,680 | 745 | 130 |
| 10 | 11,360 | 1,490 | 260 |
| 15 | 17,040 | 2,235 | 390 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 49,026 UAH.
How these numbers are computed
Nearby
- Stiikove2 km1,139 kWh/kWp
- Zhevanivka5 km1,143 kWh/kWp
- Honcharykha6 km1,140 kWh/kWp
- Lysycha Balka6 km1,141 kWh/kWp
- Kalnybolota6 km1,143 kWh/kWp
- Romeikovo6 km1,136 kWh/kWp
All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.