Solar plant: site data
Solar power plant in Huliaika, Zvenyhorodskyi Raion, Cherkasy Oblast
Huliaika: 1,137 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.6% below the oblast median (1,144). #169 of 197 in the rayon, #572 of 731 in the oblast.
Shpola, the rayon centre, is 47 km away. 185 m above sea level. 11 km away: Talne, the nearest bigger centre, the same 1,142. Snow and wind from the nearest regional centre in the DBN — Черкаси, 108 km. 10.94 m between rows, pitch 14.81 m (latitude 49.0°).
- Yield of 1 kWp
- 1,137kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,369kWh/year
- Row pitch
- 14.81m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Huliaika
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 108 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 26 — 5.7 times less.
December: 26 against 28 in the oblast, 7.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,685 | 740 | 130 |
| 10 | 11,369 | 1,480 | 260 |
| 15 | 17,054 | 2,220 | 390 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.
How these numbers are computed
Nearby
- Kobrynove2 km1,134 kWh/kWp
- Antonivka3 km1,137 kWh/kWp
- Zaliske5 km1,140 kWh/kWp
- Husakove6 km1,140 kWh/kWp
- Onopriivka7 km1,140 kWh/kWp
- Veselyi Kut9 km1,136 kWh/kWp
All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.