Huliaika: 1,137 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.6% below the oblast median (1,144). #169 of 197 in the rayon, #572 of 731 in the oblast.

Shpola, the rayon centre, is 47 km away. 185 m above sea level. 11 km away: Talne, the nearest bigger centre, the same 1,142. Snow and wind from the nearest regional centre in the DBN — Черкаси, 108 km. 10.94 m between rows, pitch 14.81 m (latitude 49.0°).

Yield of 1 kWp
1,137kWh/year
Tilt
36°3° east of south
10 kW
11,369kWh/year
Row pitch
14.81m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Huliaika

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 108 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb89Mar118Apr138May142Jun148Jul144Aug116Sep88Oct39Nov26Dec

July: 148 kWh/kWp, December: 26 — 5.7 times less.

December: 26 against 28 in the oblast, 7.1% less.

Huliaika: plants, kWh
kWpA yearJulyDecember
55,685740130
1011,3691,480260
1517,0542,220390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed