Solar plant: site data

Solar power plant in Blahodatne, Zolotoniskyi Raion, Cherkasy Oblast

Blahodatne: 1,161 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.5% above the oblast median (1,144). #35 of 160 in the rayon, #70 of 731 in the oblast.

Zolotonosha, the rayon centre, is 13 km away. 83 m above sea level. 13 km away: Cherkasy, the nearest bigger centre, 1,138 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 13 km. 11.68 m between rows, pitch 15.50 m (latitude 49.6°).

Yield of 1 kWp
1,161kWh/year
Tilt
37°1° east of south
10 kW
11,607kWh/year
Row pitch
15.50m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Blahodatne

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 13 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan59Feb99Mar121Apr141May144Jun147Jul144Aug116Sep86Oct38Nov29Dec

July: 147 kWh/kWp, December: 29 — 5.1 times less.

January: 38 against 35 in the oblast, 8.6% more.

Blahodatne: plants, kWh
kWpA yearJulyDecember
55,804735145
1011,6071,470290
1517,4112,205435

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolotoniskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.