Section of the table from the Solispec engine (median zone — Cherkasy)

Tongwei

Ground frame for 30 Tongwei TNC 2.0 TWMNH-48HW470 panels (3×10)

3 rows of 10 panels, 14.10 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
14.10kW
Steel
616.3kg
Posts
16
Bolts
212
Materials
69,132₴
Yield
16,057kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Tongwei TNC 2.0 TWMNH-48HW470 panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 60×40×2
Frames8 frames, pitch up to 1,600 mm8 frames, pitch up to 1,600 mm6 frames, pitch up to 2,200 mm
Posts161612
Footings (bored concrete)16 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø350 mm, depth 1,100 mm12 pcs, Ø350 mm, depth 1,500 mm
Concrete2.43 m³1.86 m³1.91 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,558 mm600 / 2,558 mm600 / 2,524 mm
Panel field size11,660 × 3,534 mm11,660 × 3,534 mm11,660 × 3,553 mm
Row spacing between tables (no shade on 21 December)11,950 mm at noon · 13,430 mm ±2 h13,240 mm at noon · 15,290 mm ±2 h14,510 mm at noon · 17,250 mm ±2 h
Steel616.3 kg616.3 kg541.9 kg
BoltsM10 — 146, M8 — 66M10 — 146, M8 — 66M10 — 118, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials71,343 UAH69,132 UAH74,529 UAH
With installation and delivery108,035 UAH105,824 UAH110,789 UAH
Per 1 kW7,662 UAH/kW7,505 UAH/kW7,857 UAH/kW
Yield1,266 kWh/kW · 17,857 kWh/year1,139 kWh/kW · 16,057 kWh/year1,043 kWh/kW · 14,708 kWh/year
Strength σ/fy57%77%87%
Deflection / (L/200)45%61%75%
Rafter strength73%99%77%
Post utilisation19%26%37%
Utilisation91%93%92%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 91%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.6 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 93%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.2 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 92%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter Tube 60×60×2: span between posts 2 753, cantilever 997 mm → strength 99%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 87%, deflection 75% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,3078
П2Rear postTube 60×60×23,6838
Кр1Rafter (inclined beam)Tube 60×60×24,7468
Пк1Frame strutC-channel 41×41×2.52,0618
Пк2Front frame strutC-channel 41×41×2.52,7068
Х1Longitudinal brace (cross)C-channel 41×41×2.52,5024
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.55,6603
Р4Purlin (rail)C-channel 41×41×2.55,6603
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——130
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×150 set · strut to rafter — through spacer inserts——8
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 16 posts, Ø350×1100——1.86 m³

Profile cutting

38 bars of 6,000 mm, 204.0 m of profile in total.

  • Tube 60×60×216 bars
  • C-channel 41×41×2.522 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
69,132₴
With installation and delivery
105,824₴
Per 1 kW
7,505UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 22 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm16 bar21020,160
C-channel 41×41×2.5, stock length 6 000 mm22 bar20026,400
C-channel connector (splice plate L 300)6 pcs90540
Bolt M10×140 cl. 8.8 set — frame, struts56 pcs221,232
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors89 pcs221,958
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×150 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)54 pcs321,728
Bolt M8×50 A2 + spring channel nut M873 pcs141,022
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.15 m³900135
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.86 m³3,8007,068
Rebar Ø10 (4 bars per post)84 m282,352
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 8 × 60 mm, 4 × 30 mm, 8 × 10 mm32 pcs00
Materials69,132

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 16,057 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.