Section of the table from the Solispec engine (median zone — Cherkasy)

Sunova

Ground frame for 24 Sunova Tangra S Pro SS-BG440-54MDH(T) panels (2×12)

2 rows of 12 panels, 10.56 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
10.56kW
Steel
376.6kg
Posts
14
Bolts
164
Materials
50,627₴
Yield
12,026kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Sunova Tangra S Pro SS-BG440-54MDH(T) panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,640 mm7 frames, pitch up to 2,220 mm7 frames, pitch up to 2,220 mm
Posts121414
Footings (bored concrete)12 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete1.83 m³1.20 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,809 mm600 / 1,809 mm600 / 1,809 mm
Panel field size13,968 × 2,274 mm13,968 × 2,274 mm13,968 × 2,274 mm
Row spacing between tables (no shade on 21 December)7,770 mm at noon · 8,740 mm ±2 h8,610 mm at noon · 9,950 mm ±2 h9,440 mm at noon · 11,220 mm ±2 h
Steel368.7 kg376.6 kg386.7 kg
BoltsM10 — 102, M8 — 52M10 — 112, M8 — 52M10 — 112, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials48,956 UAH50,627 UAH51,771 UAH
With installation and delivery76,786 UAH78,137 UAH79,281 UAH
Per 1 kW7,271 UAH/kW7,399 UAH/kW7,508 UAH/kW
Yield1,266 kWh/kW · 13,374 kWh/year1,139 kWh/kW · 12,026 kWh/year1,043 kWh/kW · 11,015 kWh/year
Strength σ/fy80%78%84%
Deflection / (L/200)83%68%73%
Rafter strength43%76%82%
Post utilisation13%16%17%
Utilisation87%90%75%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 640 mm, 6 frames. Purlin C-channel 60×40×2: strength 80%, deflection 83% of L/200 (snow on panel 489 Pa).Chernihiv: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 84%, deflection 73% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.6 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 90%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 684, cantilever 610 mm → strength 82%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0927
П2Rear postTube 60×60×22,9347
Кр1Rafter (inclined beam)C-channel 60×40×22,9047
Пк1Frame strutC-channel 60×40×21,4027
Х1Longitudinal brace (cross)C-channel 60×40×22,5324
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×21,9682
Р6Purlin (rail)C-channel 60×40×21,9682
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×120 set · post–rafter——28
—Bolt M10×130 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

24 bars of 6,000 mm, 131.3 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×217 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
50,627₴
With installation and delivery
78,137₴
Per 1 kW
7,399UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm7 bar2108,820
C-channel 60×40×2, stock length 6 000 mm17 bar23023,460
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors46 pcs221,012
Bolt M10×80 cl. 8.8 set — purlin to rafter28 pcs27756
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts7 pcs27189
Bolt M10×120 cl. 8.8 set — post–rafter28 pcs27756
Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts7 pcs27189
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)44 pcs321,408
Bolt M8×50 A2 + spring channel nut M858 pcs14812
Post base anchor pin (M10 / rebar Ø12)14 pcs20280
Borehole casing (roofing felt / PVC, 300 mm)14 pcs60840
Crushed stone 20–40 for the bottom of the boreholes0.10 m³90090
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)24 pcs20480
Cable clip, stainless72 pcs5360
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.20 m³3,8004,560
Rebar Ø10 (4 bars per post)73 m282,044
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 7 × 70 mm, 4 × 30 mm, 7 × 10 mm22 pcs00
Materials50,627

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 12,026 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×12 layout with other panels

Next