Section of the table from the Solispec engine (median zone — Cherkasy)

Seraphim

Ground frame for 12 Seraphim Sable SRP-640-BTZ-BG panels (2×6)

2 rows of 6 panels, 7.68 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
7.68kW
Steel
299.0kg
Posts
10
Bolts
104
Materials
37,446₴
Yield
8,746kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Seraphim Sable SRP-640-BTZ-BG panel and the 2 × 6 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 1,640 mm5 frames, pitch up to 1,640 mm5 frames, pitch up to 1,640 mm
Posts101010
Footings (bored concrete)10 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.16 m³1.16 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,363 mm600 / 2,347 mm600 / 2,347 mm
Panel field size7,044 × 3,196 mm7,044 × 3,206 mm7,044 × 3,206 mm
Row spacing between tables (no shade on 21 December)11,110 mm at noon · 12,490 mm ±2 h12,310 mm at noon · 14,210 mm ±2 h13,490 mm at noon · 16,030 mm ±2 h
Steel299.9 kg299.0 kg306.2 kg
BoltsM10 — 76, M8 — 28M10 — 76, M8 — 28M10 — 76, M8 — 28
Panel clampsend 8, middle 20end 8, middle 20end 8, middle 20
Materials36,006 UAH37,446 UAH40,853 UAH
With installation and delivery56,641 UAH58,081 UAH61,488 UAH
Per 1 kW7,375 UAH/kW7,563 UAH/kW8,006 UAH/kW
Yield1,266 kWh/kW · 9,726 kWh/year1,139 kWh/kW · 8,746 kWh/year1,043 kWh/kW · 8,011 kWh/year
Strength σ/fy83%63%67%
Deflection / (L/200)68%40%43%
Rafter strength54%73%79%
Post utilisation16%22%23%
Utilisation100%87%87%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 640 mm, 5 frames. Purlin C-channel 41×41×2.5: strength 83%, deflection 68% of L/200 (snow on panel 489 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.3 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 100%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 9.9 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 87%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.7 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 87%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2975
П2Rear postTube 60×60×23,4725
Кр1Rafter (inclined beam)Tube 60×60×24,0505
Пк1Frame strutC-channel 60×40×21,8705
Х1Longitudinal brace (cross)C-channel 60×40×22,3744
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×21,0442
Р4Purlin (rail)C-channel 60×40×21,0442
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——63
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——13
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——20
—Bolt M8×50 + channel nut——28
—Concrete for 10 posts, Ø350×1100——1.16 m³

Profile cutting

18 bars of 6,000 mm, 96.1 m of profile in total.

  • Tube 60×60×210 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
37,446₴
With installation and delivery
58,081₴
Per 1 kW
7,563UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm10 bar21012,600
C-channel 60×40×2, stock length 6 000 mm8 bar23011,040
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×140 cl. 8.8 set — frame, struts25 pcs22550
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors46 pcs221,012
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts13 pcs27351
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)20 pcs32640
Bolt M8×50 A2 + spring channel nut M831 pcs14434
Post base anchor pin (M10 / rebar Ø12)10 pcs20200
Borehole casing (roofing felt / PVC, 300 mm)10 pcs60600
Crushed stone 20–40 for the bottom of the boreholes0.10 m³90090
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow23 m35805
Module earthing clip (under the clamp)12 pcs20240
Cable clip, stainless36 pcs5180
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.16 m³3,8004,408
Rebar Ø10 (4 bars per post)52 m281,456
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 5 × 70 mm, 4 × 30 mm, 5 × 10 mm18 pcs00
Materials37,446

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 8,746 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×6 layout with other panels

Next