Section of the table from the Solispec engine (median zone — Cherkasy)

Luxor

Ground frame for 5 Luxor Eco Line Pro LX-630M/182R-132+ GG (bifacial) panels (1×5)

1 row of 5 panels, 3.15 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
3.15kW
Steel
147.7kg
Posts
8
Bolts
54
Materials
20,650₴
Yield
3,587kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Luxor Eco Line Pro LX-630M/182R-132+ GG (bifacial) panel and the 1 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm
Posts888
Footings (bored concrete)8 pcs, Ø300 mm, depth 900 mm8 pcs, Ø300 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete0.56 m³0.68 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,338 mm600 / 1,338 mm600 / 1,338 mm
Panel field size5,890 × 1,459 mm5,890 × 1,459 mm5,890 × 1,459 mm
Row spacing between tables (no shade on 21 December)5,350 mm at noon · 6,010 mm ±2 h5,920 mm at noon · 6,840 mm ±2 h6,490 mm at noon · 7,720 mm ±2 h
Steel141.9 kg147.7 kg153.5 kg
BoltsM10 — 42, M8 — 12M10 — 42, M8 — 12M10 — 42, M8 — 12
Panel clampsend 4, middle 8end 4, middle 8end 4, middle 8
Materials20,026 UAH20,650 UAH21,312 UAH
With installation and delivery29,341 UAH29,965 UAH30,627 UAH
Per 1 kW9,315 UAH/kW9,513 UAH/kW9,723 UAH/kW
Yield1,266 kWh/kW · 3,989 kWh/year1,139 kWh/kW · 3,587 kWh/year1,043 kWh/kW · 3,286 kWh/year
Strength σ/fy49%68%74%
Deflection / (L/200)34%48%51%
Rafter strength8%11%12%
Post utilisation5%7%8%
Utilisation66%47%39%
Depth vs frost depthokokok
Checks overallpassespassespasses

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

No cautions.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0224
П2Rear postTube 60×60×22,4634
Кр1Rafter (inclined beam)Tube 60×60×21,5224
Пк1Frame strutC-channel 60×40×29984
Х1Longitudinal brace (cross)C-channel 60×40×21,9414
Р1Purlin (rail)C-channel 60×40×25,8902
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——30
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——12
—End clamp 30 mm——4
—Mid clamp (30–40 mm)——8
—Bolt M8×50 + channel nut——12
—Concrete for 8 posts, Ø300×1100——0.68 m³

Profile cutting

9 bars of 6,000 mm, 47.6 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×24 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
20,650₴
With installation and delivery
29,965₴
Per 1 kW
9,513UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 19 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm5 bar2106,300
C-channel 60×40×2, stock length 6 000 mm4 bar2305,520
Bolt M10×140 cl. 8.8 set — frame, struts25 pcs22550
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors10 pcs22220
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts12 pcs27324
End clamp 30 mm4 pcs35140
Mid clamp (30–40 mm)8 pcs32256
Bolt M8×50 A2 + spring channel nut M814 pcs14196
Post base anchor pin (M10 / rebar Ø12)8 pcs20160
Borehole casing (roofing felt / PVC, 300 mm)8 pcs60480
Crushed stone 20–40 for the bottom of the boreholes0.06 m³90054
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow19 m35665
Module earthing clip (under the clamp)5 pcs20100
Cable clip, stainless15 pcs575
Zinc paint / cold galvanising spray 400 ml1 pcs350350
Concrete M200 for posts0.68 m³3,8002,584
Rebar Ø10 (4 bars per post)42 m281,176
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 4 × 70 mm, 4 × 30 mm, 4 × 10 mm16 pcs00
Materials20,650

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 3,587 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.