Section of the table from the Solispec engine (median zone — Cherkasy)

LONGi

Ground frame for 30 LONGi Hi-MO 6 LR5-72HTH-580M panels (2×15)

2 rows of 15 panels, 17.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.40kW
Steel
583.9kg
Posts
22
Bolts
216
Materials
73,955₴
Yield
19,815kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the LONGi Hi-MO 6 LR5-72HTH-580M panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames9 frames, pitch up to 2,100 mm11 frames, pitch up to 1,690 mm10 frames, pitch up to 1,870 mm
Posts182220
Footings (bored concrete)18 pcs, Ø400 mm, depth 1,100 mm22 pcs, Ø300 mm, depth 1,100 mm20 pcs, Ø300 mm, depth 1,300 mm
Concrete2.74 m³1.88 m³2.02 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,211 mm600 / 2,211 mm600 / 2,202 mm
Panel field size17,430 × 2,970 mm17,430 × 2,970 mm17,430 × 2,975 mm
Row spacing between tables (no shade on 21 December)10,270 mm at noon · 11,540 mm ±2 h11,380 mm at noon · 13,140 mm ±2 h12,470 mm at noon · 14,820 mm ±2 h
Steel518.4 kg583.9 kg560.7 kg
BoltsM10 — 132, M8 — 64M10 — 152, M8 — 64M10 — 142, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials70,014 UAH73,955 UAH78,412 UAH
With installation and delivery114,454 UAH118,285 UAH122,797 UAH
Per 1 kW6,578 UAH/kW6,798 UAH/kW7,057 UAH/kW
Yield1,266 kWh/kW · 22,036 kWh/year1,139 kWh/kW · 19,815 kWh/year1,043 kWh/kW · 18,150 kWh/year
Strength σ/fy69%61%80%
Deflection / (L/200)57%41%59%
Rafter strength90%99%80%
Post utilisation18%19%23%
Utilisation98%98%89%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 178, cantilever 789 mm → strength 90%.Cherkasy: Rafter C-channel 60×40×2: span between posts 2 178, cantilever 789 mm → strength 99%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.3 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 98%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.0 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 89%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 870 mm, 10 frames. Purlin C-channel 60×40×2: strength 80%, deflection 59% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,24611
П2Rear postTube 60×60×23,33611
Кр1Rafter (inclined beam)C-channel 60×40×23,75611
Пк1Frame strutC-channel 60×40×21,75111
Х1Longitudinal brace (cross)C-channel 60×40×22,3174
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×25,4302
Р6Purlin (rail)C-channel 60×40×25,4302
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——44
—Bolt M10×90 set · strut to post — through spacer inserts——11
—Bolt M10×130 set · post–rafter — through spacer inserts——44
—Bolt M10×140 set · strut to rafter — through spacer inserts——11
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×55 + channel nut——64
—Concrete for 22 posts, Ø300×1100——1.88 m³

Profile cutting

36 bars of 6,000 mm, 201.0 m of profile in total.

  • Tube 60×60×211 bars
  • C-channel 60×40×225 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
73,955₴
With installation and delivery
118,285₴
Per 1 kW
6,798UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 19,815 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.