Section of the table from the Solispec engine (median zone — Cherkasy)

GCL

Ground frame for 20 GCL-NT10/78GDF 640 panels (2×10)

2 rows of 10 panels, 12.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
12.80kW
Steel
397.2kg
Posts
14
Bolts
140
Materials
56,390₴
Yield
14,576kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the GCL-NT10/78GDF 640 panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames7 frames, pitch up to 1,850 mm7 frames, pitch up to 1,850 mm7 frames, pitch up to 1,850 mm
Posts141414
Footings (bored concrete)14 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø350 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete2.13 m³1.63 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,347 mm600 / 2,338 mm600 / 2,338 mm
Panel field size11,660 × 3,206 mm11,660 × 3,211 mm11,660 × 3,211 mm
Row spacing between tables (no shade on 21 December)11,110 mm at noon · 12,490 mm ±2 h12,310 mm at noon · 14,210 mm ±2 h13,490 mm at noon · 16,030 mm ±2 h
Steel400.7 kg397.2 kg407.3 kg
BoltsM10 — 96, M8 — 44M10 — 96, M8 — 44M10 — 96, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials52,935 UAH56,390 UAH60,913 UAH
With installation and delivery86,017 UAH89,472 UAH93,995 UAH
Per 1 kW6,720 UAH/kW6,990 UAH/kW7,343 UAH/kW
Yield1,266 kWh/kW · 16,210 kWh/year1,139 kWh/kW · 14,576 kWh/year1,043 kWh/kW · 13,352 kWh/year
Strength σ/fy59%80%86%
Deflection / (L/200)43%58%62%
Rafter strength93%86%92%
Post utilisation18%25%26%
Utilisation96%98%98%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 349, cantilever 851 mm → strength 93%.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 349, cantilever 851 mm → strength 86%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 349, cantilever 851 mm → strength 92%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 11.2 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 98%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.9 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 98%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 850 mm, 7 frames. Purlin C-channel 60×40×2: strength 86%, deflection 62% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2897
П2Rear postTube 60×60×23,4637
Кр1Rafter (inclined beam)C-channel 80×40×24,0507
Пк1Frame strutC-channel 60×40×21,8637
Х1Longitudinal brace (cross)C-channel 60×40×22,5214
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×25,6602
Р4Purlin (rail)C-channel 60×40×25,6602
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×100 set · purlin to rafter——28
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×50 + channel nut——44
—Concrete for 14 posts, Ø350×1100——1.63 m³

Profile cutting

27 bars of 6,000 mm, 138.4 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 80×40×27 bars
  • C-channel 60×40×213 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
56,390₴
With installation and delivery
89,472₴
Per 1 kW
6,990UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 14,576 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×10 layout with other panels

Next