Section of the table from the Solispec engine (median zone — Cherkasy)

Canadian Solar

Ground frame for 10 Canadian Solar TOPBiHiKu7 CS7N-705TB-AG panels (2×5)

2 rows of 5 panels, 7.05 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
7.05kW
Steel
237.2kg
Posts
8
Bolts
90
Materials
35,138₴
Yield
8,028kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Canadian Solar TOPBiHiKu7 CS7N-705TB-AG panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 80×40×2C-channel 80×40×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 1,570 mm4 frames, pitch up to 2,040 mm5 frames, pitch up to 1,570 mm
Posts10810
Footings (bored concrete)10 pcs, Ø350 mm, depth 1,100 mm8 pcs, Ø400 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.16 m³1.22 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,305 mm600 / 2,280 mm600 / 2,280 mm
Panel field size6,735 × 3,095 mm6,735 × 3,110 mm6,735 × 3,110 mm
Row spacing between tables (no shade on 21 December)10,740 mm at noon · 12,080 mm ±2 h11,900 mm at noon · 13,750 mm ±2 h13,050 mm at noon · 15,510 mm ±2 h
Steel271.8 kg237.2 kg275.7 kg
BoltsM10 — 76, M8 — 24M10 — 66, M8 — 24M10 — 76, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials36,592 UAH35,138 UAH42,329 UAH
With installation and delivery55,377 UAH54,045 UAH61,124 UAH
Per 1 kW7,855 UAH/kW7,666 UAH/kW8,670 UAH/kW
Yield1,266 kWh/kW · 8,928 kWh/year1,139 kWh/kW · 8,028 kWh/year1,043 kWh/kW · 7,354 kWh/year
Strength σ/fy73%94%60%
Deflection / (L/200)57%75%37%
Rafter strength74%89%73%
Post utilisation15%25%21%
Utilisation92%89%80%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionpasses

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.4 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 92%.Cherkasy: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 89%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 040 mm, 4 frames. Purlin C-channel 60×40×2: strength 94%, deflection 75% of L/200 (snow on panel 977 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 278, cantilever 825 mm → strength 89%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2664
П2Rear postTube 60×60×23,4054
Кр1Rafter (inclined beam)C-channel 80×40×23,9284
Пк1Frame strutC-channel 60×40×21,8124
Х1Longitudinal brace (cross)C-channel 60×40×22,6304
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×27352
Р4Purlin (rail)C-channel 60×40×27352
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×90 set · strut to post — through spacer inserts——4
—Bolt M10×100 set · purlin to rafter——16
—Bolt M10×130 set · post–rafter — through spacer inserts——16
—Bolt M10×140 set · strut to rafter — through spacer inserts——4
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 33 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×50 + channel nut——24
—Concrete for 8 posts, Ø400×1100——1.22 m³

Profile cutting

16 bars of 6,000 mm, 83.1 m of profile in total.

  • Tube 60×60×24 bars
  • C-channel 80×40×24 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
35,138₴
With installation and delivery
54,045₴
Per 1 kW
7,666UAH/kW

The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 8,028 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×5 layout with other panels