Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 20 Astronergy ASTRO N5 CHSM72N-HC-590 panels (2×10)

2 rows of 10 panels, 11.80 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
11.80kW
Steel
420.0kg
Posts
16
Bolts
150
Materials
53,459₴
Yield
13,438kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N5 CHSM72N-HC-590 panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames7 frames, pitch up to 1,850 mm8 frames, pitch up to 1,600 mm7 frames, pitch up to 1,850 mm
Posts141614
Footings (bored concrete)14 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete2.13 m³1.37 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,211 mm600 / 2,211 mm600 / 2,211 mm
Panel field size11,660 × 2,970 mm11,660 × 2,970 mm11,660 × 2,970 mm
Row spacing between tables (no shade on 21 December)10,270 mm at noon · 11,540 mm ±2 h11,380 mm at noon · 13,140 mm ±2 h12,470 mm at noon · 14,820 mm ±2 h
Steel387.5 kg420.0 kg423.9 kg
BoltsM10 — 96, M8 — 44M10 — 106, M8 — 44M10 — 96, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials52,935 UAH53,459 UAH53,408 UAH
With installation and delivery83,517 UAH83,964 UAH84,355 UAH
Per 1 kW7,078 UAH/kW7,116 UAH/kW7,149 UAH/kW
Yield1,266 kWh/kW · 14,944 kWh/year1,139 kWh/kW · 13,438 kWh/year1,043 kWh/kW · 12,309 kWh/year
Strength σ/fy54%55%79%
Deflection / (L/200)39%34%57%
Rafter strength80%94%76%
Post utilisation16%18%23%
Utilisation87%93%89%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.8 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 93%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.9 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 89%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 2 178, cantilever 789 mm → strength 94%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2468
П2Rear postTube 60×60×23,3368
Кр1Rafter (inclined beam)C-channel 60×40×23,7568
Пк1Frame strutC-channel 60×40×21,7518
Х1Longitudinal brace (cross)C-channel 60×40×22,2504
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×25,6602
Р4Purlin (rail)C-channel 60×40×25,6602
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——32
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×120 set · post–rafter——32
—Bolt M10×130 set · strut to rafter — through spacer inserts——8
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×55 + channel nut——44
—Concrete for 16 posts, Ø300×1100——1.37 m³

Profile cutting

26 bars of 6,000 mm, 144.4 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 60×40×218 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
53,459₴
With installation and delivery
83,964₴
Per 1 kW
7,116UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm8 bar21010,080
C-channel 60×40×2, stock length 6 000 mm18 bar23024,840
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors18 pcs22396
Bolt M10×80 cl. 8.8 set — purlin to rafter43 pcs271,161
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts8 pcs27216
Bolt M10×120 cl. 8.8 set — post–rafter32 pcs27864
Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts8 pcs27216
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
End clamp 35 mm8 pcs35280
Mid clamp (30–40 mm)36 pcs321,152
Bolt M8×55 A2 + spring channel nut M849 pcs14686
Post base anchor pin (M10 / rebar Ø12)16 pcs20320
Borehole casing (roofing felt / PVC, 300 mm)16 pcs60960
Crushed stone 20–40 for the bottom of the boreholes0.11 m³90099
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow33 m351,155
Module earthing clip (under the clamp)20 pcs20400
Cable clip, stainless60 pcs5300
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.37 m³3,8005,206
Rebar Ø10 (4 bars per post)84 m282,352
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 8 × 70 mm, 4 × 30 mm, 8 × 10 mm24 pcs00
Materials53,459

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 13,438 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.