Section of the table from the Solispec engine (median zone — Cherkasy)

Astronergy

Ground frame for 20 Astronergy ASTRO N5 CHSM54N-HC-435 panels (2×10)

2 rows of 10 panels, 8.70 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
8.70kW
Steel
323.1kg
Posts
12
Bolts
130
Materials
43,838₴
Yield
9,907kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Astronergy ASTRO N5 CHSM54N-HC-435 panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 2,710 mm6 frames, pitch up to 2,200 mm6 frames, pitch up to 2,200 mm
Posts101212
Footings (bored concrete)10 pcs, Ø400 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.52 m³1.03 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,809 mm600 / 1,809 mm600 / 1,809 mm
Panel field size11,660 × 2,274 mm11,660 × 2,274 mm11,660 × 2,274 mm
Row spacing between tables (no shade on 21 December)7,770 mm at noon · 8,740 mm ±2 h8,610 mm at noon · 9,950 mm ±2 h9,440 mm at noon · 11,220 mm ±2 h
Steel298.7 kg323.1 kg331.8 kg
BoltsM10 — 76, M8 — 44M10 — 86, M8 — 44M10 — 86, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials42,270 UAH43,838 UAH44,774 UAH
With installation and delivery65,190 UAH66,725 UAH67,661 UAH
Per 1 kW7,493 UAH/kW7,670 UAH/kW7,777 UAH/kW
Yield1,266 kWh/kW · 11,018 kWh/year1,139 kWh/kW · 9,907 kWh/year1,043 kWh/kW · 9,075 kWh/year
Strength σ/fy84%77%83%
Deflection / (L/200)90%66%71%
Rafter strength67%75%81%
Post utilisation14%15%17%
Utilisation89%90%74%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 710 mm, 5 frames. Purlin C-channel 60×40×2: strength 84%, deflection 90% of L/200 (snow on panel 489 Pa).Chernihiv: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 83%, deflection 71% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.9 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.5 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 90%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 684, cantilever 610 mm → strength 81%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0926
П2Rear postTube 60×60×22,9346
Кр1Rafter (inclined beam)C-channel 60×40×22,9046
Пк1Frame strutC-channel 60×40×21,4026
Х1Longitudinal brace (cross)C-channel 60×40×22,5144
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×25,6602
Р4Purlin (rail)C-channel 60×40×25,6602
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——24
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×130 set · post–rafter — through spacer inserts——24
—Bolt M10×140 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×50 + channel nut——44
—Concrete for 12 posts, Ø300×1100——1.03 m³

Profile cutting

21 bars of 6,000 mm, 112.7 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 60×40×215 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
43,838₴
With installation and delivery
66,725₴
Per 1 kW
7,670UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 9,907 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×10 layout with other panels

Next