Section of the table from the Solispec engine (Lviv)

Ground plant · Lviv

A 8 kW ground-mounted solar plant in Lviv: structure, materials, cost

14 Ulica UL-620M-132DDGN (dual glass bifacial) panels (8.68 kW) on 1 table of 2 × 7. Snow and wind per the DBN for Lviv: S₀ 1,310 Pa, W₀ 520 Pa.

Power
8.68kW
Steel
325.6kg
Posts
12
Bolts
118
Materials
43,615₴
Yield
9,726kWh/year

Ground frame designer

Design the 8 kW plant in the builder

Opens the 2 × 7 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Lviv.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Panel

Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.

The table's structure

Layout1 table, each 2 × 7 = 14 panels
Loads (DBN V.1.2-2:2006)snow S₀ 1,310 Pa, wind W₀ 520 Pa, frost depth 0.9 m
PostsTube 60×60×2
RaftersC-channel 60×40×2
Purlins and bracesC-channel 60×40×2
Frames6 frames, pitch up to 1,550 mm
Posts12
Footings (bored concrete)12 pcs, Ø350 mm, depth 1,200 mm
Concrete1.52 m³
Tilt30°
Panel bottom / post top600 / 2,287 mm
Panel field size8,198 × 3,102 mm
Row spacing between tables (no shade on 21 December)12,090 mm at noon · 14,030 mm ±2 h
Steel325.6 kg
BoltsM10 — 86, M8 — 32
Panel clampsend 8, middle 24
Materials43,615 UAH
With installation and delivery66,452 UAH
Per 1 kW7,656 UAH/kW
Yield1,121 kWh/kW · 9,726 kWh/year

Checks and cautions

CheckValueStatus
Strength σ/fy53%passes
Deflection / (L/200)33%passes
Rafter strength98%with a caution
Post utilisation19%passes
Utilisation90%with a caution
Depth vs frost depthokpasses
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 98%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Foundation Ø350 × 1 200: 0.115 m³ of concrete per post. Wind uplift on the front post ≈ 11.1 kN (with γ=1.5) vs ≈ 12.4 kN (concrete weight + soil friction, estimate) → 90%.

Bill of materials

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,3746
П2Rear postTube 60×60×23,5126
Кр1Rafter (inclined beam)C-channel 60×40×23,9246
Пк1Frame strutC-channel 60×40×21,8186
Х1Longitudinal brace (cross)C-channel 60×40×22,2684
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×22,1982
Р4Purlin (rail)C-channel 60×40×22,1982
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——24
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×130 set · post–rafter — through spacer inserts——24
—Bolt M10×140 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——24
—Bolt M8×50 + channel nut——32
—Concrete for 12 posts, Ø350×1200——1.52 m³

Profile cutting

20 bars of 6,000 mm, 111.6 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 60×40×214 bars

Estimated cost

Materials
43,615₴
With installation and delivery
66,452₴
Per 1 kW
7,656UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,121 kWh per 1 kW a year, ≈ 9,726 kWh a year in total for Lviv (tilt 30°, the optimum for the latitude is 35.4°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other sizes in Lviv

8 kW in other regional centres

Next