10 kW hybrid inverter: panels per string (Krakow)

How many 590 W panels fit in one string of a 10 kW hybrid inverter in Krakow at a frost of -24 °C: a range of 5 to 17 panels, voltage in the cold, the MPPT window, input current and the split across two inputs.

Por Solispec editorial5 min de lectura

Este texto aún no está traducido — se muestra el original.

On a Sofar HYD 10KTL-3PH hybrid inverter in Krakow, with an assumed minimum of −24 °C, one string holds 5 to 17 panels of 590 W. Seventeen panels reach 996.5 V in the cold against a limit of 1000 V, eighteen reach 1055 V. The lower limit comes from the 180 V MPPT window. The calculation is preliminary.

Below is the whole calculation for one concrete set: the Astronergy ASTRO N5 CHSM72N-HC-590 panel, the Sofar HYD 10KTL-3PH inverter, Krakow. Every figure comes from the same engine functions behind the free strings calculator, so you can repeat it with your own data. The general rules (why frost raises the voltage and what the four checks are) are in the article on panels per string and frost.

Starting data

ItemValue
PanelAstronergy ASTRO N5 CHSM72N-HC-590, 590 W
Open-circuit voltage at STC (Voc)52.2 V, coefficient α −0.25 %/K
Short-circuit current, Isc14.3 A
Current at the maximum power point, Imp13.6 A
InverterSofar HYD 10KTL-3PH, hybrid, 10 kW, three-phase
Maximum input voltage1000 V
MPPT range180 to 960 V, two MPPT inputs
Maximum input short-circuit current45 A (operating current up to 32 A)
Minimum temperature in Krakow−24 °C (an assumption of the example, not a standard value)

For your own project take the minimum temperature from data for your site, not from this example.

Voltage in the cold

The engine computes the open-circuit voltage in the cold with the formula of annex B of HD 60364-7-712: U_oc max = U_oc · (1 + α · (T_min − 25) / 100). For this panel and −24 °C the factor is 1.12 and one panel gives 58.6 V.

PanelsVoltage in the coldLimitResult
16937.9 V1000 Vfits
17996.5 V1000 Vfits, margin 3.5 V
181055.1 V1000 V55 V over

The upper limit is 17 panels. A margin of 3.5 V is small: it is a computed limit, so check the string again whenever you change the assumed minimum temperature or the panel. Exceeding the maximum input voltage is a risk to the inverter, not only lost production.

MPPT window: the lower limit

On a hot summer day the operating voltage of one panel falls to 36.9 V. The string must then still sit inside the MPPT window from 180 V.

PanelsOperating voltage in the heatLower MPPT limitResult
4147.6 V180 Vtoo low, the inverter loses tracking
5184.5 V180 Vfits

The lower limit is 5 panels. Seventeen panels meet the upper end of the window (960 V) with room to spare: in the cold the operating voltage is 855.9 V.

Input current

The panel's short-circuit current of 14.3 A is inside the 45 A input limit, and the operating current of 13.6 A inside 32 A. With one string per input the current does not depend on the number of panels in series, because in series voltages add and currents do not. The current grows only when several strings are paralleled on one input.

Splitting the panels across two inputs

The inverter has two MPPT inputs. The simplest split is two identical strings: the same panel, the same count, the same orientation.

OptionSplitDC powerVoltage in the coldResult
16 panels2 × 89.44 kWp468.9 Vfits
20 panels2 × 1011.8 kWp586.2 Vfits
34 panels2 × 1720.06 kWp996.5 Vvoltage fine, the DC power needs a separate assessment

The engine checks the voltages and currents of a string but does not judge how much DC power the inverter takes in total. That is a separate question about the DC to AC ratio, covered in the article on the DC/AC ratio. The kinds of inverter are described in the article on inverter types.

Table: how frost changes the range

For the same panel and inverter:

T_minPanel voltage in the coldMax panelsVoltage at the maximum
0 °C55.5 V18998.7 V
−5 °C56.1 V17954.3 V
−10 °C56.8 V17965.4 V
−15 °C57.4 V17976.5 V
−24 °C58.6 V17996.5 V
−25 °C58.7 V17998.7 V

The range of 5 to 17 holds across the whole interval from −5 to −25 °C. At 0 °C 18 panels would fit, but Krakow gets colder than that, so such an assumption would be wrong.

Checklist

  1. Write down from the datasheets: Voc, Vmp, Isc, Imp and α of the panel, and the maximum voltage, MPPT window and input currents of the inverter.
  2. Assume the absolute minimum temperature of the site.
  3. Compute the voltage in the cold and the upper limit of the panel count.
  4. Compute the voltage in the heat and the lower limit.
  5. Split the panels across the inputs: the same panels and the same orientation within one string.
  6. Check the chosen option in the strings calculator. You can compare panels and inverters in the panel catalogue and the inverter catalogue.

The calculation is preliminary. The minimum temperature is an assumption of the example, and the panel and inverter data come from the Solispec catalogue and depend on the datasheet version. Before installation the calculation must be checked by a qualified engineer, and the installation must be done only by a qualified electrician.

FAQ

How many 590 W panels fit in one string with a 10 kW inverter in Krakow?

From 5 to 17 at a minimum of −24 °C: 17 panels give 996.5 V in the cold against a limit of 1000 V, 18 panels give 1055 V.

Why are four panels in a string too few?

In summer the operating voltage of four panels is 147.6 V, below the lower MPPT limit of 180 V. Five panels give 184.5 V.

Can I connect 17 panels when the margin is 3.5 V?

The arithmetic holds, but the margin is small. Check the string again if you change the panel or the assumed minimum temperature.

ElectricidadNormas

Novedades y consejos de diseño

Qué hay de nuevo en Solispec, cambios en la normativa y consejos prácticos para diseñar instalaciones solares.

Qué te interesa

Cómo tratamos tus datos: política de privacidad.

Diseñador de estructuras en suelo

Diseña la estructura en suelo de tu planta solar

Solispec elige los perfiles y postes, comprueba la estructura frente a la nieve y el viento y la presupuesta hasta el último tornillo.

  • Sin registro
  • Comprobación de nieve y viento
  • Planos y presupuesto