Solar power plant in Zhytomyr, Zhytomyrskyi Raion, Zhytomyr Oblast

Zhytomyr: 1,108 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,104). #432 of 686 in the rayon, #659 of 1700 in the oblast.

Zhytomyr is the rayon centre. 236 m above sea level. 116 km away: Vinnytsya, the nearest bigger centre, 1,127 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 2 km. 12.34 m between rows, pitch 16.16 m (latitude 50.3°).

Yield of 1 kWp
1,108kWh/year
Tilt
37°2° east of south
10 kW
11,078kWh/year
Row pitch
16.16m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Zhytomyr

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 2 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan56Feb92Mar119Apr134May140Jun139Jul136Aug111Sep83Oct36Nov29Dec

June: 140 kWh/kWp, December: 29 — 4.8 times less.

December: 29 against 27 in the oblast, 7.4% more.

Zhytomyr: plants, kWh
kWpA yearJuneDecember
55,539700145
1011,0781,400290
1516,6172,100435

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed