Solar plant: site data
Solar power plant in Yablunets, Zviahelskyi Raion, Zhytomyr Oblast
Yablunets: 1,102 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,104). #114 of 294 in the rayon, #974 of 1700 in the oblast.
Zvyahel, the rayon centre, is 40 km away. 210 m above sea level. 40 km away: Zvyahel, the nearest bigger centre, the same 1,101. Snow and wind from the nearest regional centre in the DBN — Житомир, 74 km. 13.18 m between rows, pitch 16.95 m (latitude 50.8°).
- Yield of 1 kWp
- 1,102kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,020kWh/year
- Row pitch
- 16.95m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Yablunets
The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 74 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 141 kWh/kWp, December: 27 — 5.2 times less.
February: 57 against 56 in the oblast, 1.8% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,510 | 705 | 135 |
| 10 | 11,020 | 1,410 | 270 |
| 15 | 16,530 | 2,115 | 405 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.
How these numbers are computed
Nearby
- Riasne4 km1,102 kWh/kWp
- Kamianka4 km1,101 kWh/kWp
- Velykyi Yablunets5 km1,110 kWh/kWp
- Malyi Yablunets5 km1,105 kWh/kWp
- Simakivka5 km1,103 kWh/kWp
- Nedilyshche6 km1,106 kWh/kWp
All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.