Solar plant: site data

Solar power plant in Shevchenko, Korostenskyi Raion, Zhytomyr Oblast

Shevchenko: 1,113 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 0.8% above the oblast median (1,104). #4 of 560 in the rayon, #327 of 1700 in the oblast.

Korosten, the rayon centre, is 34 km away. 151 m above sea level. 34 km away: Korosten, the nearest bigger centre, 1,105 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 109 km. 13.64 m between rows, pitch 17.41 m (latitude 51.2°).

Yield of 1 kWp
1,113kWh/year
Tilt
38°2° east of south
10 kW
11,130kWh/year
Row pitch
17.41m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Shevchenko

The designer opens with this place’s coordinates, latitude 51.2° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 109 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan58Feb97Mar121Apr136May142Jun140Jul136Aug112Sep79Oct35Nov26Dec

June: 142 kWh/kWp, December: 26 — 5.5 times less.

January: 31 against 34 in the oblast, 8.8% less.

Shevchenko: plants, kWh
kWpA yearJuneDecember
55,565710130
1011,1301,420260
1516,6952,130390

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Korostenskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.