Solar power plant in Rudnia-Ozerianska, Korostenskyi Raion, Zhytomyr Oblast

Rudnia-Ozerianska: 1,066 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 3.5% below the oblast median (1,104). #500 of 560 in the rayon, #1636 of 1700 in the oblast.

Korosten, the rayon centre, is 55 km away. 187 m above sea level. 55 km away: Korosten, the nearest bigger centre, 1,105 — 3.6% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 122 km. 13.71 m between rows, pitch 17.48 m (latitude 51.3°).

Yield of 1 kWp
1,066kWh/year
Tilt
38°4° east of south
10 kW
10,656kWh/year
Row pitch
17.48m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Rudnia-Ozerianska

The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 122 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb88Mar114Apr128May137Jun135Jul133Aug108Sep76Oct33Nov27Dec

June: 137 kWh/kWp, December: 27 — 5.1 times less.

October: 76 against 81 in the oblast, 6.2% less.

Rudnia-Ozerianska: plants, kWh
kWpA yearJuneDecember
55,328685135
1010,6561,370270
1515,9842,055405

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Korostenskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.