Solar plant: site data

Solar power plant in Nesolon, Zviahelskyi Raion, Zhytomyr Oblast

Nesolon: 1,108 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,104). #33 of 294 in the rayon, #647 of 1700 in the oblast.

Zvyahel, the rayon centre, is 23 km away. 215 m above sea level. 23 km away: Zvyahel, the nearest bigger centre, 1,101 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 63 km. 12.93 m between rows, pitch 16.70 m (latitude 50.6°).

Yield of 1 kWp
1,108kWh/year
Tilt
38°2° east of south
10 kW
11,080kWh/year
Row pitch
16.70m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Nesolon

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 63 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan57Feb92Mar118Apr134May142Jun139Jul136Aug111Sep81Oct36Nov28Dec

June: 142 kWh/kWp, December: 28 — 5.1 times less.

December: 28 against 27 in the oblast, 3.7% more.

Nesolon: plants, kWh
kWpA yearJuneDecember
55,540710140
1011,0801,420280
1516,6202,130420

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.