Solar plant: site data
Solar power plant in Mykhiivka, Zviahelskyi Raion, Zhytomyr Oblast
Mykhiivka: 1,083 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.9% below the oblast median (1,104). #263 of 294 in the rayon, #1514 of 1700 in the oblast.
Zvyahel, the rayon centre, is 19 km away. 189 m above sea level. 19 km away: Zvyahel, the nearest bigger centre, 1,101 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 85 km. 13.09 m between rows, pitch 16.86 m (latitude 50.7°).
- Yield of 1 kWp
- 1,083kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 10,829kWh/year
- Row pitch
- 16.86m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,320 / 520Pa
Ground frame designer
A ground frame for a solar plant: Mykhiivka
The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 85 km: snow 1,320 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 138 kWh/kWp, December: 28 — 4.9 times less.
October: 78 against 81 in the oblast, 3.7% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,415 | 690 | 140 |
| 10 | 10,829 | 1,380 | 280 |
| 15 | 16,244 | 2,070 | 420 |
Example: a 10 kW ground frame
For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Dibrivske3 km1,090 kWh/kWp
- Kurchytsia4 km1,083 kWh/kWp
- Krasylivka5 km1,093 kWh/kWp
- Khodurky6 km1,081 kWh/kWp
- Morozivka6 km1,094 kWh/kWp
- Berehove6 km1,090 kWh/kWp
All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.