Solar plant: site data

Solar power plant in Lisohirka, Berdychivskyi Raion, Zhytomyr Oblast

Lisohirka: 1,097 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.7% below the oblast median (1,104). #159 of 160 in the rayon, #1211 of 1700 in the oblast.

Berdychiv, the rayon centre, is 51 km away. 309 m above sea level. 23 km away: Khmilnyk, the nearest bigger centre, 1,116 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 72 km. 11.59 m between rows, pitch 15.46 m (latitude 49.8°).

Yield of 1 kWp
1,097kWh/year
Tilt
36°2° east of south
10 kW
10,971kWh/year
Row pitch
15.46m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Lisohirka

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 72 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan49Feb84Mar118Apr135May139Jun142Jul138Aug112Sep84Oct37Nov29Dec

July: 142 kWh/kWp, January: 29 — 4.9 times less.

January: 29 against 34 in the oblast, 14.7% less.

Lisohirka: plants, kWh
kWpA yearJulyJanuary
55,486710145
1010,9711,420290
1516,4572,130435

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.