Solar power plant in Lebedyntsi, Berdychivskyi Raion, Zhytomyr Oblast
Lebedyntsi: 1,114 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.9% above the oblast median (1,104). #43 of 160 in the rayon, #279 of 1700 in the oblast.
Berdychiv, the rayon centre, is 38 km away. 236 m above sea level. 38 km away: Berdychiv, the nearest bigger centre, 1,108 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 49 km. 12.02 m between rows, pitch 15.84 m (latitude 49.9°).
- Yield of 1 kWp
- 1,114kWh/year
- Tilt
- 37°3° east of south
- 10 kW
- 11,141kWh/year
- Row pitch
- 15.84m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Lebedyntsi
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 49 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 144 kWh/kWp, December: 27 — 5.3 times less.
January: 30 against 34 in the oblast, 11.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,571 | 720 | 135 |
| 10 | 11,141 | 1,440 | 270 |
| 15 | 16,712 | 2,160 | 405 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.
How these numbers are computed
Nearby
- Pavelky3 km1,116 kWh/kWp
- Harapivka4 km1,122 kWh/kWp
- Lisove4 km1,110 kWh/kWp
- Brovky Pershi6 km1,113 kWh/kWp
- Yareshky6 km1,113 kWh/kWp
- Minkivtsi7 km1,122 kWh/kWp
All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed