Solar plant: site data

Solar power plant in Batkivshchyna, Korostenskyi Raion, Zhytomyr Oblast

Batkivshchyna: 1,090 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.3% below the oblast median (1,104). #367 of 560 in the rayon, #1424 of 1700 in the oblast.

Korosten, the rayon centre, is 27 km away. 145 m above sea level. 27 km away: Korosten, the nearest bigger centre, 1,105 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 94 km. 13.47 m between rows, pitch 17.24 m (latitude 51.1°).

Yield of 1 kWp
1,090kWh/year
Tilt
38°3° east of south
10 kW
10,899kWh/year
Row pitch
17.24m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Batkivshchyna

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 94 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb93Mar117Apr133May139Jun137Jul133Aug109Sep77Oct33Nov27Dec

June: 139 kWh/kWp, December: 27 — 5.1 times less.

January: 36 against 34 in the oblast, 5.9% more.

Batkivshchyna: plants, kWh
kWpA yearJuneDecember
55,450695135
1010,8991,390270
1516,3492,085405

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Korostenskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.