Solar power plant in Barvinkove, Korostenskyi Raion, Zhytomyr Oblast

Barvinkove: 1,101 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). Exactly the oblast median (1,104). #162 of 560 in the rayon, #996 of 1700 in the oblast.

Korosten, the rayon centre, is 42 km away. 229 m above sea level. 42 km away: Korosten, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Житомир, 120 km. 13.77 m between rows, pitch 17.54 m (latitude 51.3°).

Yield of 1 kWp
1,101kWh/year
Tilt
38°3° east of south
10 kW
11,014kWh/year
Row pitch
17.54m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Barvinkove

The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 120 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb93Mar119Apr133May141Jun138Jul135Aug111Sep79Oct34Nov27Dec

June: 141 kWh/kWp, December: 27 — 5.2 times less.

January: 35 against 34 in the oblast, 2.9% more.

Barvinkove: plants, kWh
kWpA yearJuneDecember
55,507705135
1011,0141,410270
1516,5212,115405

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed