Solar plant: site data
Solar power plant in Ostrivia, Kovelskyi Raion, Volyn Oblast
Ostrivia: 1,064 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 1.9% below the oblast median (1,084). #321 of 383 in the rayon, #984 of 1120 in the oblast.
Kovel, the rayon centre, is 73 km away. 163 m above sea level. 73 km away: Kovel, the nearest bigger centre, 1,079 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 140 km. 14.35 m between rows, pitch 18.07 m (latitude 51.6°).
- Yield of 1 kWp
- 1,064kWh/year
- Tilt
- 39°3° east of south
- 10 kW
- 10,639kWh/year
- Row pitch
- 18.07m · GCR 0.26
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,240 / 480Pa
Ground frame designer
A ground frame for a solar plant: Ostrivia
The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 140 km: snow 1,240 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 134 kWh/kWp, December: 27 — 5.0 times less.
October: 77 against 80 in the oblast, 3.8% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,320 | 670 | 135 |
| 10 | 10,639 | 1,340 | 270 |
| 15 | 15,959 | 2,010 | 405 |
Example: a 10 kW ground frame
For the loads of Lutsk: 11.16 kWp, 18 panels, 387 kg of steel, 14 piles, materials ≈ 51,425 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.